Client

Ancon Directional Drilling

Project Length

3 Months

Project overview:

Install gas main across Bowen River – Far North Qld

Description of work:

  • Directional drill under Bowen River (QLD) in 2 locations and install a 500mm steel gas main
  • Both drills completed in cobble ground conditions
  • Each drill was 600 metres