Client

SA Water

Project Length

3 Months

Project overview:

SADB completed works for SA Water with the installation of 4000m sewer pipeline. All works completed in a residential area, through rear property easements.

Description of work:

  • HDD installation of 4000m of 180mm to 450mm PE sewer line
  • 30 x SA Water property connections
  • Installation of 5 x manholes