Client
SA Water
Project Length
3 Months
Project overview:
SADB completed works for SA Water with the installation of 4000m sewer pipeline. All works completed in a residential area, through rear property easements.
Description of work:
- HDD installation of 4000m of 180mm to 450mm PE sewer line
- 30 x SA Water property connections
- Installation of 5 x manholes