Client

City of Salisbury

Project Length

6 weeks

Project overview :

Design and construction of pedestrian underpass under Port Wakefield Rd. Dredging and re shaping of open drain.

Description of work:

  • Undertook creek rejuvenation removing in excess of 400m³ of creek silt to allow high flow drainage
  • Constructed 200 lm of concrete pavement to designed specification for sea water
  • Constructed 20 lm of flood wall, doweling into existing bridge piers and constructed pavement, including water proofing membrane
  • Dredging and removal of silt from existing open drain