Client

City of Salisbury

Project Length

2 Months

Project overview:

SADB undertook the supply and install 350 metres x 2100mm diametre concrete stormwater pipe. The system was linked to an existing catchment area and installed 5.5m deep, with final diversion into the Bridgestone Park Wetlands.

Description of work:

  • All civil works for the supply installation of 2100mm diameter stormwater pipe- installed in roadway
  • Supply and installation of precast head walls and precast junction pits
  • Installation of gabion structure
  • Extensive traffic control
  • Relocation of existing underground services – water mains, sewer and stormwater
  • Final commissioning and development
  • Reconstruction of 400 metres of roadway