Client

DPTI

Project Length

5 Weeks

Project overview :

Engaged by DPTI – SADB were awarded the lighting project to install conduits and lighting poles. The project was to upgrade the lighting on a section of Grand Junction Rd.

Description of work:

  • Supply and installation of road lighting electrical conduit, 500 metres of conduits installed with HDD
  • Supply and installation of electrical pits
  • Supply and installation of rag bolt street light footing x 6
  • Installation of 6 x street light poles
  • Installation of electrical cables, termination and commissioning