Client
SAPN
Project Length
3 Months
Project overview:
Engaged by SAPN and the District Council of Mt Barker – SADB delivered the undergrounding of the existing high voltage and low voltage electricity network.
Description of work:
- All works completed within a heritage listed zone of the Mt Barker area
- HDD, NDE and trenching was engaged to complete the underground network, with 2000m of multiple conduits installed
- Other works included installation of electrical pits, switching cubicle, property connection points and road lighting
- Extensive customer consultation & liaison with residents and key stakeholders was required