Client

SAPN

Project Length

3 Months

Project overview:

Engaged by SAPN and the District Council of Mt Barker – SADB delivered the undergrounding of the existing high voltage and low voltage electricity network.

Description of work:

  • All works completed within a heritage listed zone of the Mt Barker area
  • HDD, NDE and trenching was engaged to complete the underground network, with 2000m of multiple conduits installed
  • Other works included installation of electrical pits, switching cubicle, property connection points and road lighting
  • Extensive customer consultation & liaison with residents and key stakeholders was required