Client

Guidera O'Connor

Project Length

6 Months

Project overview:

The project was deemed to be highly sensitive, upgrading a privately owned water supply to SA Water standards. The works, involved the upgrade of the existing infrastructure, whilst maintaining water supply within tight residential streets in an eco sensitive Adelaide Hills area.

Description of work:

  • SADB installed new water main infrastructure and all associated civil works
  • Works completed included installation of 1200 metres of 150mm – 225mm water main in DCIL and PVC
  • Installation of all stop valves, scour valves, air valves, and hydrant valves
  • 55 residential connections and metre installations were also completed