Client

City of Prospect

Project Length

8 Weeks

Project overview:

Engaged by The City of Prospect – SADB installed 450 metres of 1500mm x 750mm stormwater culvert through residential Prospect. The project involved extensive resident consultation due to the restricted access.

Description of work:

The works for the Churchill Road catchment drainage diversion project comprised of the following activities:

  • Demolition & modifications to existing side entry pit including reinstating existing pipe connections
  • Supply & installation of 1500mm x 750mm Stormwater culvert
  • Modifications and partial demolition to existing Churchill Road 1650mm x 675mm pneumatic core drain
  • Construction of a flow splitter chamber at the junction of Elizabeth Street/Churchill Road
  • Supply, installation and backfill of new reinforced concrete box culverts
  • Construction of new junction pits, side entry pits and stormwater pipe connections