Client

City of West Torrens

Project Length

10 Weeks

Project overview:

SADB were awarded a pipeline project for The City of West Torrens. The project involved the connection of council reserves to the SA Water GAP water network, installing recycled water throughout suburbs of the City of West Torrens – to supply rewater to council infrastructure and reserves.

Description of work:

  • The pipeline was tendered to be completed by conventional trenching methodology
  • SADB worked with the project designers, Tonkins Engineers on an alternative construction method utilising HDD and NDE
  • 6000 metres of PE pipe was installed providing a network to irrigate 8 council reserves
  • As part of the pipeline works, PRV’s and valves were installed to WSA standards