Client
Ancon Directional Drilling
Project Length
3 Months
Project overview:
Install gas main across Bowen River – Far North Qld
Description of work:
- Directional drill under Bowen River (QLD) in 2 locations and install a 500mm steel gas main
- Both drills completed in cobble ground conditions
- Each drill was 600 metres