Client

ElectraNet

Project Length

2 Months

Project overview:

The project objective was to develop a stormwater system that would capture run-off via RCP pipe stormwater water network. All stormwater was diverted to a bio-retention filtration system, which was then used to service the surrounding vegetation through a recycled water system.

Description of work:

  • Supply and installation of stormwater network – RCP pipe 300mm to 450mm
  • Supply and installation of stormwater junction pits and side entry pits
  • Build bio-retention stormwater filtration system to capture car park stormwater runoff
  • Installation of recycled water
  • Landscaping of the bio-retention systems with various plants to assist with filtration