Project overview :
Engaged by DPTI – SADB were awarded the lighting project to install conduits and lighting poles. The project was to upgrade the lighting on a section of Grand Junction Rd.
Description of work:
- Supply and installation of road lighting electrical conduit, 500 metres of conduits installed with HDD
- Supply and installation of electrical pits
- Supply and installation of rag bolt street light footing x 6
- Installation of 6 x street light poles
- Installation of electrical cables, termination and commissioning