Client
District Council of Mallala
Project Length
8 Months
Project overview:
SADB were engaged by The District Council of Mallala to install a new CWMS – Community Wastewater Management System.
Description of work:
Over an 8 month build, SADB completed the following works;
- 7km of 150ml PVC sewer gravity main – due to the flat terrain in the work area, the majority of the pipeline was installed at depths ranging from 2000mm to 5000m deep
- 8km of rising mains and irrigation mains installed via HDD
- 355 property connections, inspection points and junction pits
- 7 property connections to a domestic pressure sewer pump system
- Construction of 10ML winter storage pond with HDPE liner
- Installed 5 pump stations to carry the effluent to the newly constructed 10ML winter storage pond
- Completed all electrical and SCADA works to enable the system
- Final commissioning and testing of system