Client

Public Transport Projects Alliance (PTPA)

Duration

5 Months

Project Objective:
Removal of the Ovingham Level Crossing and relocation of multiple SA Water assets to allow for the construction of a new bridge on Torrens Road

Description of Work:
SADB has been engaged by McConnell Dowel to relocate multiple sections of water and sewer main lines to make way for construction of a new bridge. SADB are installing the pipeline via HDD (Horizontal Directional Drilling), conventional trenching and NDE (Non-Destructive Excavation).

  • Multiple cut ins to existing trunk mains
  • Valve and fire plug installation
  • Concrete thrust block to secure installations
  • Commissioning and hydrostatic testing