Client

SAPN

Project Length

6 Weeks

Project overview:

Installation of 3 x precast large manholes and 250m of 8 x 100mm electrical conduits to provide high voltage power to new Calvary Hospital.

Description of work:

  • Works completed on a shift rotation bases
  • Manholes installed within 3 major road intersections in the CBD area
  • Manhole configuration of 5 m long x 4m deep x 3m wide, split manholes installed over existing high voltage network