Client
SAPN
Project Length
6 Weeks
Project overview:
Installation of 3 x precast large manholes and 250m of 8 x 100mm electrical conduits to provide high voltage power to new Calvary Hospital.
Description of work:
- Works completed on a shift rotation bases
- Manholes installed within 3 major road intersections in the CBD area
- Manhole configuration of 5 m long x 4m deep x 3m wide, split manholes installed over existing high voltage network