Client

DPTI

Project Length

2 Months

Project overview:

SADB engaged by DPTI, for the design and construction of early works for service relocation of SAPN infrastructure.

Description of work:

  • Working under live rail conditions, SADB undertook 6 crossings at major intersections of road and rail
  • High voltage and low voltage cables were installed
  • HDD drills ranged from 4 x 125mm conduits to 10 x 125mm conduits
  • Drill distance varied from 30 metres to 120 metres
  • All conduit termination and precast pit installation was completed