Client
City of Tea Tree Gully
Project Length
2 Months
Project overview:
Engaged by The City of Tea Tree Gully to upgrade the existing STED sewer system to a SA Water compliant sewer. SADB handled the design and construction of the system.
Description of work:
- Customer consultation
- Survey and design to SA Water standards
- Installation of 400 metres of 180mm PE pipeline in rear of property easement to grade
- 20 property connections to SA Water standards
- Supply and installation of 2 x 2200mm diametre pump stations – both 6 metres deep
- Connection of system to existing SA Water network
- Decommissioning of STED system, removal of septic tanks and backfill