Client

City of Tea Tree Gully

Project Length

2 Months

Project overview:

Engaged by The City of Tea Tree Gully to upgrade the existing STED sewer system to a SA Water compliant sewer. SADB handled the design and construction of the system.

Description of work:

  • Customer consultation
  • Survey and design to SA Water standards
  • Installation of 400 metres of 180mm PE pipeline in rear of property easement to grade
  • 20 property connections to SA Water standards
  • Supply and installation of 2 x 2200mm diametre pump stations – both 6 metres deep
  • Connection of system to existing SA Water network
  • Decommissioning of STED system, removal of septic tanks and backfill