Client
DPTI
Project Length
3 Months
Project overview:
Underground services relocations works – inclusive of power & communications conduits for the DPTI Superway Project – South Rd
Description of work:
- Works completed in conjunction with SAPN to relocate the existing high voltage network
- Completed 2000 metres of HDD with multiple conduit installations
- Drilled and installed 24 x 125mm conduits over a 240 metre drill shot