Seaford Rail | Rail | 230m | 280 mm PE |
Murray River Irrigation | Cliff Face | 55m 110m | 630mm PE |
River Crossing (Onkaparinga) | River | 360m | 1 x 450mm PE Water Main |
Grade Drills | Sewer grade drilling | Drill lengths ranging from 120m to 320m | 180mm to 710mm PE |
Out shore Bore (Tasmania) | Sea/ out shore for inbound power feed | 350m | 180mm PE |
Adelaide Airport | Runway | 100m | 125mm PE |
Lower Lakes Crossing | Lakes | 280m | 355mm PE |
Hackney Trunk Main Upgrade | Road | 300m | 800mmPE |
River Crossing | River | 300m | 710 PE |
River Torrens Crossing | River | 190m | 2 x 630mm & 1 x 450mm |
Olympic Dam | Mining Infrastructure and services | 2000m | Multi way (x4 110mm communications conduit) |