Client
City of Marion
Project Length
8 Weeks
Project overview:
SADB engaged by The City of Marion to complete a stormwater upgrade and installation of gross pollutant trap. Work completed in an environmentally sensitive zone along the beach foreshore.
Description of work:
Works Completed in 3 stages
- Installation of 450mm stormwater pipe, junction boxes and a small gross pollutant trap. System installed alongside operating Beach side café and customer car park.
- Link into existing stormwater system and installation new junction boxes. Installation of 6000mm x 5000mm x 4500mm large gross pollutant trap on beach foreshore. Extensive shoring and dewater required for the installation.
- Removal and disposal of existing damaged gross pollutant trap. Replaced with 1200mm diameter stormwater pipe link to the new gross pollutant trap.