The sewer trunk main will connect the Springbrook development to Council’s existing sewer network at the corner of Sims road and Hartman Road.

Further Project Details:

The total length of new pipeline was approximately 809 meters through a Greenfield site.

Maintenance holes are fixed by co-ordinates and lie within a 3m wide easement and therefore their location is critical.

Approval from the landowners was obtained for works to be undertaken outside the easement.

The project included the supply, construction and reinstatement of the following:

  • 92.60 meters DN500 HDPE pipe
  • 632.74 meters DN400 HDPE pipe
  • 175.88 meters DN355 pipe
  • 13 Maintenance Holes