Client:
District Council of Mt Barker
Description of work:
The Hampden Road pipeline and pump station is an integral part of the District Council of Mt Barker’s wastewater network and is an integral part of its future-proofing strategy.
- Install:
- 100 metres of 800mm carrier pipe via HDD
- 120 metres of 560mm carrier pipe via HDD
- 60 metres of 280mm carrier pipe via HDD
- Tunnel bore and install SN64,000 GRP Jacking Pipe (OD1029)
- 80 metres of 280mm carrier pipe via HDD
- 140 metres of 800mm HDPE via micro tunnel