Client
City of Prospect
Project Length
8 Weeks
Project overview:
Engaged by The City of Prospect – SADB installed 450 metres of 1500mm x 750mm stormwater culvert through residential Prospect. The project involved extensive resident consultation due to the restricted access.
Description of work:
The works for the Churchill Road catchment drainage diversion project comprised of the following activities:
- Demolition & modifications to existing side entry pit including reinstating existing pipe connections
- Supply & installation of 1500mm x 750mm Stormwater culvert
- Modifications and partial demolition to existing Churchill Road 1650mm x 675mm pneumatic core drain
- Construction of a flow splitter chamber at the junction of Elizabeth Street/Churchill Road
- Supply, installation and backfill of new reinforced concrete box culverts
- Construction of new junction pits, side entry pits and stormwater pipe connections