Description of work:

The Rural City of Murray Bridge entered into a community water supply agreement with SA water to receive treated effluent from the Swanport Village Road Pump Station for the irrigation of public open space along Swanport Road and nearby reserves. SADB was engaged to carry out the construction work of the new pipeline with approximate distance of 1,650 metres. In addition to the construction, SADB was also involved in the design phase of the pipeline along Swanport Road as we proposed HDD option as an alternative to traditional trenching to minimise disruption to DIT maintained road.

  • 950 metres of 140mm PE PN16 via HDD in DIT Road
  • 700 metres of DN150 PVC via Trenching
  • 1 x SA Water meter
  • 4 x scour valves
  • 10 x manual air valves
  • 1 x automatic air valve
  • 6 x gate valves